|
Full Name |
E-mail
me and I'll let you know |
|
D.O.B. |
June-66 |
|
Nationality |
British |
|
Current
Location |
UK |
|
Languages |
- English
- Conversational German (a bit rusty though !)
- Conversational Thai
|
|
Marital Status |
Married with one child |
|
|
|
|
|
|
|
Present
Employment |
From 05/11 to present
day
Proactive Technical Recruitment,
Egham, England |
|
Job Title |
FMCG
Recruitment Consultant |
|
Responsibilities |
-
Work with Clients to
identified skills required to fill
their vacancies.
-
Identify Candidates
with the correct skills and
experience to fill Client’s vacancy.
-
Arrange interviews
with Client and Candidates.
-
Carry out Mechanical
and Electrical testing of Clients
current Technical staff to benchmark
their abilities allowing Clients to
identify areas of Technical weakness
within their Engineering departments
|
|
|
|
|
Previous
Employment |
From
11/09 to 04/11
The Wrigley Company Ltd, Plymouth,
England |
|
Business |
Confectionary Manufacturer |
|
Job Title |
Reliability Engineer |
|
Responsibilities |
-
Lead Lean PM Pillar
through successful Japan Institute
of Plant Maintenance (JIPM) TPM
Excellence award pre audit and
subsequently through successful
final audit resulting in the
Plymouth factory receiving JIPM TPM
Excellence certification.
-
Lead newly formed
days based reliability team using
lean methods to continuously improve
plant and equipment.
-
Manage and develop 8
direct reports.
-
Communicate with
shift based technicians to
understand and collate breakdown and
reliability issues.
-
Constantly review
Planned Maintenance schedules for
improved effectiveness
-
Provide technical
advice, problem solving assistance
and support operational areas by
defining equipment performance
requirements and repair
specifications.
-
Manage engineering
stores with focus on driving down
required stock value.
-
Control maintenance
budget c. £550,000pa
-
Support Engineering
Project team to identify available
resources
|
|
|
|
|
Previous
Employment |
From 07/06
to 11/09
Holdfast Systems Ltd |
|
Business |
IT
Supply and Support |
|
Job Title |
Technical
Manager |
|
Responsibilities |
-
Consultation with
customers to identify current and
future IT needs.
-
Specification of
secure WAN, LAN and VPN networking
hardware and infrastructure,
servers, desktop PCs and laptops
-
Supply, configuration
and installation of structured Cat5e
and Cat 6 cabling, networking
hardware, VPN, servers and PCs
- Ongoing support of network
hardware and infrastructure.
- End
user support.
- Specification of IP CCTV systems,
- Supply, configuration and
installation of IP CCTV systems.
- Ongoing monitoring and support of IP
CCTV systems.
- CCTV End
user support.
|
|
|
|
|
Previous
Employment |
08/89 to 07/06
Mars Confectionary, Slough, England
|
|
|
From
03/04 to 07/06
Masterfoods (part of Mars Inc),
Slough, England |
|
Business |
Confectionary Manufacturer |
|
Job Title |
Technician Team Leader |
|
Responsibilities |
-
Lead, manage and develop
a team of 5
technicians
providing factory wide PPM and an agreed level of
reactive maintenance cover for the
factory processes. wrapping areas and utilities.
-
Maintain a Skills
Matrix for the team with a priority
action plan to close the gaps by
identifying training needs and
ensuring that team members attend
relevant courses.
-
Agree working
priorities with Operational Shift
Managers on a daily basis.
-
Attend operational
and technical/engineering meetings
and divest information and
priorities to the Team.
-
Interrogation of PLCs
(Including Texas, Philips,
Mitsubishi, Schneider, Siemens S5 &
S7) to identify faults.
-
Identify and execute
activities with the Team to maximise
effectiveness outside of the core
breakdown role, including:-
Project identification and
completion. Project assistance.
Works order completion. Training.
-
Support and assist
the Team technicians to develop
within their roles.
-
Complete Performance
Development Reviews for each
technician.
-
Ensure that team
complies with the Job Involvement
meeting requirements.
-
Interface with days
based Technologist peers to
ensure effective use of the shift
Team.
-
Ensure that workplace
standards conform to the current
Good Manufacturing Practices and
Good Housekeeping Practices
standards.
-
Control Team
attendance within guidelines agreed
with the Reliability Manager.
-
Ensure that the Team maintain
personal safety standards.
|
|
|
|
|
Previous Employment |
From 06/02 to
03/04.
Working on assignment for PT Effem
Indonesia (part of Mars Inc) in Medan,
Indonesia |
|
Business |
Confectionery
Manufacturer. |
|
Job Title |
Production Engineer |
|
Responsibilities |
-
Design, installation
and commissioning of electrical and
control systems for new and existing equipment including
Schneider Modicon
Momentum PLC and Magelis
HMI hardware and
software.
-
Hands on support of the local Engineering
Team with the design, installation and commissioning of
capital projects
-
Support
the local Maintenance Team
in performing effective
troubleshooting and
preventative maintenance
of the existing
confectionery production
lines.
-
Ongoing improvement
of the process and
packaging areas.
-
Supervision of equipment installation and
commissioning.
-
Configure and calibrate instrumentation and
motor control equipment.
-
Maintain plant documentation.
-
Assist in the development
of Planned Maintenance
systems.
-
Assist in the setting up of
Quality and
Safety systems.
-
Troubleshooting support
for the Production Team.
-
Train
Indonesian counterparts in all aspects of the
above responsibilities
|
|
|
|
|
Previous
Employment |
From 01/00 to
06/02. Working on assignment
for Effem Foods (Thailand) (part of Mars Inc.) in Pakchong,
Thailand. |
|
Business |
Dry Pet food
Manufacturer. |
|
Job Title |
Engineering
Control Technician. |
|
Responsibilities |
-
Supervision of HV, MV and LV Electrical
Utilities installation during construction of a new factory.
-
Design, installation
and commissioning of electrical and
control systems for a pilot plant including Schneider Modicon
Momentum PLC and Magelis
HMI hardware and
software.
-
Hands on support of the local Engineering
Team with the design, installation and commissioning of
capital projects
-
Hands on support of the local Maintenance
Team in performing effective troubleshooting and preventative
maintenance of the existing dry pet food production line.
-
Ongoing improvement in the process and
packaging areas.
-
Project management of
new equipment installation,
configuration and
commissioning.
-
Site management of 3rd
party contractors.
-
Configure and calibrate instrumentation and
motor control equipment.
-
Maintain plant documentation.
-
Assist in the development of mechanical and
electrical Planned Maintenance systems.
-
Assist in the setting up of quality and
safety systems.
-
Troubleshooting support for the Production
Team.
-
Train Thai counterparts in all aspects of the
above responsibilities
|
|
|
|
|
Previous Employment |
From 12/97 to 01/00. Working on assignment for
Master Foods Middle East (part of Mars Inc.) in Dubai, UAE. |
|
Business |
Confectionery
Manufacturer. |
|
Job Title |
Project Control Engineer. |
|
Responsibilities |
-
MEI commissioning of a new factory construction project and
associated
process and
wrapping equipment.
-
Site
management
of 3rd party
construction
contractors.
-
Installation
and
modification
of second
hand
equipment.
-
Hands on support for the factory maintenance
team including preventative and breakdown maintenance and
fault finding.
-
Training new
local Maintenance Technicians.
-
Engineering support for the
completed factory and
adjacent warehousing facility as part of a small
Project/Engineering Team.
-
Identifying areas for improvement.
-
Specifying and approving designs for
installation of new Electrical and Control Systems.
- Liaising with contractors for quotations.
- Commissioning of contractors and supervision
whilst the installation work is carried out.
- Testing and commissioning of the systems once
installed.
- Maintaining electrical and control drawings and
documentation.
- Training of operators in machine operation
and factory systems.
- Liaising with local suppliers and
manufacturers for support and supply of spares.
- Identification of possible new suppliers.
- Liaising with local authorities for permits.
- Maintenance of the adjacent office building.
- Emergency Team training.
|
|
|
|
|
Previous Employment |
From 08/89 to12/97. Mars Confectionery, Slough,
England. |
| Business |
Confectionery
Manufacturer. |
|
Job Title |
Operations Area Technician |
|
Responsibilities |
- Mechanical, electrical and control, planned and reactive maintenance of 5 continuous process lines and 5 high speed wrapping areas as part of a 4 man shift team.
- Interrogation of PLCs (Including Texas, Philips, Mitsubishi, Schneider, Siemens S5) to identify faults.
- Support for the days based Maintenance and Engineering Teams on Continuous Improvement Projects.
- Installation and commissioning of new process and wrapping equipment.
- Design and implementation of HMI systems for existing equipment and new installations.
- Training of operators on new process and wrapping equipment.
- Training of prospective Electrical Technicians.
- Validation of associates on Safe Systems of Work.
- Stand in for Area Manager.
|
|
|
|
|
Previous Employment |
From 08/86 to 08/89. I.C.I. Paints, Slough,
England. |
| Business |
Paint
Manufacture. |
|
Job Title |
Instrument Artificer. |
|
Responsibilities |
- Planned and reactive maintenance on a batch process area and a paint tin filling area.
- Interrogation of Texas PLCs to identify faults.
- Redesigned and modified low pressure (5psi) air control systems used for paint tin filling machines.
- Installation and commissioning of new process and wrapping equipment.
- Training of apprentices for 3 months of their final year.
- Validation of associates on Safe Systems of Work.
- Cross training to Dual Skill, Electrical and Instrument
|
|
|
|
|
Previous Employment |
From 08/82 to 08/86. I.C.I. Chemicals, Avonmouth,
Bristol, England. |
| Business |
Chemical
Fertiliser and Pharmaceutical Manufacture. |
|
Job Title |
Apprentice Instrument Artificer. |
|
Responsibilities |
- Complete 4 year Fully Indentured
Apprenticeship at I.C.I. Chemicals, Avonmouth, Bristol,
England.
- Complete theoretical training at Newport
College of Higher Education, Newport, Wales.
|
|
|
|
|
Qualifications Gained |
Prince2 PractitionerQualified. May 2006
HNC in Engineering (Industrial Measurement and
Control). June 1986
ONC in Industrial Measurement and Control. June 1983 |
|
|
|
|
School Qualifications |
8 O' Levels, 6 CSE's. |
|
|
|
|
Hobbies |
Computers, internet, , reading,
movies, swimming, ten pin bowling, on and offline gaming, socialising. |